Westinghouse Electric Company LLC is a US based nuclear power company offering nuclear products and services to utilities internationally, including nuclear fuel, service and maintenance, instrumentation, control and design of nuclear plants. As of 2014 Westinghouse builds and operates approximately one-half of the world's operating nuclear plants. Westinghouse's world headquarters are located in the Pittsburgh suburb of Cranberry Township, Pennsylvania. Toshiba Group is the majority owner of Westinghouse.
For further chronological details, see Timeline of company evolution
During the 20th century, Westinghouse engineers and scientists were granted more than 28,000 US government patents, the third most of any company.[14]
Although no longer associated with the current CBS Corporation, Westinghouse Electric Company LLC as of 2011 still uses the trademarks owned by Westinghouse Licensing Corporation,[15] CBS' brand management subsidiary, under license, as is the case with other Westinghouse licensees.
Westinghouse Electric Company was the primary sponsor in 2010 for the 90th anniversary celebration of KDKA, a radio station licensed to Pittsburgh, launched by the original Westinghouse on November 2, 1920, and which is now owned by CBS Radio.
A revived interest in the nuclear power generation field led to Westinghouse's development of the AP1000 reactor, the first Generation III+ reactor to receive final design approval from the NRC in 2004.[16] As of 2014, four of these units are under construction in China, though the first was due to come on-line in November 2013.[17] and has been delayed until December 2014. The delay due to the constantly changing, and consequently untested, design prompted Li Yulun, former vice-president of China National Nuclear Corporation, in 2013 to raise concerns over the safety standards of the plant. Citing a lack of operating history, he questioned the manufacturer's assertion that the AP1000 reactor's "primary system canned motor pumps" were "maintenance-free" over 60 years, the assumed life of the reactor, and noted that Westinghouse had yet to receive approval from British authorities on an improved version of AP1000.[18]
As of January 2009, six AP1000 plants had been ordered in the US, and several other customers had chosen the AP1000, if they were to build new nuclear plants, for a combined total of at least 14 new plants, announced by the NuStart Consortium, Duke Power, Progress Energy, Southern Nuclear and SCE&G.[17] In May 2011 after the Fukushima Daiichi nuclear disaster, US government regulators found problems with the design of the shield building of the new reactors. Gregory Jaczko, chairman of the Nuclear Regulatory Commission since 2005 said that computations submitted by Westinghouse about the building’s design appeared to be wrong and “had led to more questions.” He said the company had not used a range of possible temperatures for calculating potential seismic stresses on the shield building in the event of an earthquake, for example. The NRC asked Westinghouse not only to fix its calculations, but also to explain why it submitted flawed information in the first place. Westinghouse countered that the “confirmatory items” that the commission was asking for were not “safety significant.”[19]
In November 2011, the AP1000 Oversight Group published a report highlighting six areas of major concern and un-reviewed safety questions requiring immediate technical review by the NRC. The report concluded that certification of the AP1000 should be delayed until the original and current “unanswered safety questions” raised by the AP1000 Oversight Group are resolved.[20]
In December 2011, the UK’s Office for Nuclear Regulation published a design assessment report on the AP1000 reactor which highlighted 51 'Generic Design Assessment' issues remaining that must be addressed before the assessment would be completed.[21]
In October 2013, US energy secretary Ernest Moniz announced, that China was to supply components to the US nuclear power plants under construction as part of a bilateral co-operation agreement between the two countries. Since China’s State Nuclear Power Technology Co (SNPTC) acquired Westinghouses's AP1000 technology in 2006, it has developed a manufacturing supply chain capable of supplying international power projects.[22] Industry analysts have pointed out that there are gaps in the Chinese supply chain.[23]
Westinghouse Electric Company fully owns several subsidiaries in Europe, such as the European Service Center, also called Westinghouse Electric Belgium located in Nivelles, Belgium, where equipment is prepared for projects throughout Europe. After Westinghouse's 1990 takeover of ABB Reaktor in Germany, it transferred radiological storage activities located in Ladenburg, Germany, to consolidate in Nivelles, which had to be extended. Soon afterwards another expansion was necessary as employees in the Brussels office were transferred to Nivelles. It was estimated that 200 people were working in Nivelles at the end of 2011.
In 2001, Westinghouse took over Logitest in Les Ulis, France, one of 3 companies qualified to inspect nuclear steam generator plants for Electricité de France.[24] After the French nuclear market partially opened in 2004 to suppliers from outside the country to fulfill European Commission directives regarding international competition, Westinghouse started to expand its business in France with a Westinghouse team located in Metz in charge of repair, replacement and automation services. By 2005 Westinghouse had 160 employees in France and two-thirds of Westinghouse's business in France was fuel supply.[25] Westinghouse Electrique France is located in Orsay and Manosque near Marseille (engineering development). As of 2014, about 400 employees are part of Westinghouse in France.
Westinghouse owns a nuclear fuel fabrication plant at Västerås, Sweden which has provided nuclear fuel for nuclear reactors from Eastern Block countries. The 2008 contract with Ukraine has been crucial for the plant.
Nuclear power in Ukraine
Westinghouse also has business locations in Germany, Spain, the UK, Russia, and Bulgaria.
In South Korea, Westinghouse has been involved in the construction of new nuclear plants since 1972, with the first plant Kori Nuclear Power Plant starting up in 1977 and in commercial operation in 1978, followed by eight reactors under construction in the early 1980s. Combustion Engineering (now Westinghouse) entered into a ten-year technology transfer program with the Korean nuclear industry aiming at self-reliance, which was extended in 1997.[26]
In December, 2006, China’s State Nuclear Power Technology Company (SNPTC) selected Westinghouse to provide four new AP1000 nuclear power plants.[14] The first was due to come on line in 2013, has been delayed until the end of 2014.[18]
Westinghouse has been involved in South Africa through support of the Koeberg Nuclear Power Station since the 1990s, both reactors are Westinghouse-licensed. In 2007 Westinghouse acquired IST Nuclear (Pty) Ltd, and won the final bidding process for new nuclear plants in South Africa, for which it signed an MOU in 2013.[27] IST Nuclear provides services and systems for the pebble-bed reactor.
There have been a number of major Westinghouse-related environmental incidents in the US. Below is a short list of these.
In July 2005 BNFL confirmed it planned to sell Westinghouse, then estimated to be worth $1.8bn (£1bn). However, the bid attracted interest from several companies, including Toshiba, General Electric and Mitsubishi Heavy Industries. When the Financial Times reported on January 23, 2006 that Toshiba had won the bid, it valued the company's offer at $5bn (£2.8bn).[31] On February 6, 2006 Toshiba confirmed it was buying Westinghouse Electric Company for $5.4bn and announced it would sell a minority stake to investors. [32] The sale surprised many industry experts who questioned the wisdom of BNFL selling one of the world's largest producers of nuclear reactors shortly before the market for nuclear power was expected to grow substantially; China, the United States and the United Kingdom were all expected to invest heavily in nuclear power.[33] Reasons in favor of a sale were: The commercial risk of the company's business in Asia may have been too high for a company then owned by taxpayers; if Westinghouse won the bid for any new nuclear stations in a UK competition, questions may be raised of favoritism, but if it lost, it might have been seen as a lack of faith in its own technology. Finally, the record of UK governments building nuclear plants had been a commercial disaster.[34]
On October 16, 2006 the acquisition of Westinghouse Electric Company for $5.4 billion was completed, with Toshiba obtaining a 77% share, partners The Shaw Group a 20% share and Ishikawajima-Harima Heavy Industries Co. Ltd. a 3% share.[35] On 13 August 2007 Toshiba sold 10% to Kazatomprom, the national uranium company for the Republic of Kazakhstan, for US$540 million, leaving Toshiba with 67%. Kazatomprom's ownership is entirely passive, with no voting or veto rights or presence on the board of directors.[36]
In September, 2011, Toshiba was reported to be in talks to acquire the Shaw stake[37] and both companies confirmed the story soon thereafter. Shaw CEO James Bernhard said, that Toshiba was paying US$1.6 Bn for the Shaw-owned 20% stake, and that it was the 50% rise in the yen on its yen-denominated debt over five years, which had led it to exercise its sale option. Toshiba said it was open to, and considering, having other partners invest in the business. The purchase closed in January 2013, and brought Toshiba's share in the company to 87%.[38][39]
In 2015 concerns were expressed that the value of assets and goodwill in Westinghouse were overstated. Following an accounting scandal in which profits were overstated at Toshiba, leading to the CEO resigning, Toshiba stated that the Westinghouse nuclear business was more profitable than at acquisition in 2006.[40][41]
After several years of doing business there, Westinghouse decided to move its world headquarters from the Energy Center in Monroeville, Pennsylvania, to Cranberry Woods in Cranberry Township, Butler County, Pennsylvania, as reported in a 2007 memo to its employees[42] that stated the main reason was the rapid expansion of the global nuclear industry. Construction began in July 2007, the move lasted from June 2009 to December 2010. The Repair, Replacement and Automation Services (RRAS) business segment moved to Cranberry Township earlier than other business segments to help alleviate space issues at the headquarters in Monroeville and was completed in spring of 2008. As part of this move, Westinghouse piloted the first commuter shuttle running an all-day loop between Monroeville and Cranberry Township. The shuttle ceased operation after Westinghouse formally closed, and sold their Monroeville facility in 2012.
signed a significant Memorandum of Understanding (MOU) with Sebata Group of Companies (Sebata Group), a leading South African-owned and operated engineering, procurement and construction management company, in preparation for the potential construction of Westinghouse AP1000® nuclear power plants in South Africa.
University of Pittsburgh, Carnegie Mellon University, Pittsburgh Steelers, Allegheny County, Pennsylvania, Duquesne University
New York City, United States, American Civil War, Hawaii, Western United States
Samsung Electronics, Sony, Fujitsu, Japan, Ibm
Nickelodeon, Mtv, Paramount Pictures, Vh1, Viacom Media Networks
Cold War, Battle of Stalingrad, Nazi Germany, Battle of the Atlantic, Second Sino-Japanese War
Cbs, Toshiba, CBS Corporation, Nikola Tesla, Westinghouse Broadcasting
Alstom, Pittsburgh, Great Depression, Nuclear power, Uranium
South Korea, Busan, Westinghouse Electric Company, Korean language, Hanja
Suffolk, East of England, Tilbury Power Station, England, Cumbria